作 者:蒋胜韬(通讯)
影响因子:*
刊物名称:中国给水排水
出版年卷:06 - 0111 - 05
文章摘要:Electrophoresis wastewater from an electrophoresis enterprises in Zhejiang Province was treated by a combined process including pretreatment /hydrolysis acidification /coagulation and sedimentation /flocculation and biological treatment. Phosphate and organic pollutants were effectively removed by controlling appropriate pH value. After the reconstruction and expansion of the project,the wastewater treatment capacity was increased to 100 m3 /d,and effluent quality met the third level criteria specified in the Integrated Wastewater Discharge Standard ( GB 8978 - 1996) .
全文链接